Location
Click Icon to Show on Map
|
City & Country |
---|---|
,
|
()
|
Integrated Water Management in Coal South Africa (Project)
At Coal South Africa, long-term integrated water management plans are being developed for sites to mitigate non-compliance risks and post-closure water management liabilities. These will be based on the development of robust conceptual hydrogeological models, which will provide high confidence … Learn More
Olifants River Join Water Forum (Project)
Anglo Platinum is a representative member and chairperson of the Executive Committee of the Olifants River Joint Water Forum which represents 22 mining companies with potentially 40 mining projects in the area. The forum is part of the Olifants River … Learn More
Risk Assessments for Aspen's Sites in South Africa (Project)
A detailed risk assessment was done for the South African operations. An internal project has been initiated to conduct the risk assessment for all Aspen Manufacturing sites. It is anticipated that this project will be completed by December 2017. Aspen … Learn More
Metering and Reducing Water Leaks at Bayer AG's Manufacturing Sites (Project)
We promote best practice and awareness through several water meters to monitor water use at different areas and find out any water leakage. As a site-specific target, the site set a maximum threshold for fresh water costs in 2016. We … Learn More
Collective Rainwater Harvesting in Costa Rica (Project)
Bayer AG is programing meetings with neighbors that use the same water sources in order to jointly promote make a better use of the water. The site also shares its rain water harvest experience with the neighbors. With regards to … Learn More
Water Replenishment in the Scheldt River Basin (Project)
Our water stewardship strategy includes a goal to replenish the water used in our beverages, where it is sourced from areas of water stress, by 2020. In Belgium, our SVAs have shown that we operate in areas of water stress … Learn More
Source Water Protection Plans for Coca-Cola European Partner's Production Sites (Project)
CCEP aims to reduce its water use ratio as far as possible, and in our legacy CCE territories, including Great Britain, we aim to reduce our water use ratio to 1.2 litres per litre of product produced. CCEP has put … Learn More
Water Replenishment in the Alte Elbe Klieken River Oxbow (Project)
Our water stewardship strategy includes a goal to replenish the water used in our beverages, where it is sourced from areas of water stress, by 2020. In Germany, our SVAs have shown that we operate three facilities in two river … Learn More
Overseeing Local Water Management Using "SPRING" method (Project)
In the state of Hidalgo, one of Mexico’s most arid regions where for water, indigenous communities there rely primarily on small springs, which are often polluted, and in some cases villagers have to walk nearly two hours to reach them. … Learn More
WaterWatcher Tool (Project)
Danone's immediate priority wherever we use water is to improve the efficiency of water use and reduce the impact of industrial processes on its quality. Our goal is to manage water quality and quantity risks at the watershed level and … Learn More