Location
Click Icon to Show on Map
|
City & Country |
---|---|
,
|
()
|
Improvement and scaling up of industrial/domestic wastewater treatment plant (Project)
At the beginning of 2014, the wastewater treatment plant was at the limit of its capacity, due to increasing of production. In 2015, Camposol started to improve its wastewater treatment plant. The Project included the construction of a solid separation … Learn More
A inicios del año 2014, la planta de tratamiento se encontraba al límite de su capacidad, debido al incremento de la producción. Es por ello que Camposol inició en el 2015 el mejoramiento de la Planta de Tratamiento de Aguas … Learn More
Generation of Energy through Biogas in Pig Farms ALIAR (Project)
Due to significant difficulties in the supply of power in the region, and the size of the equipment at the Machijure facilities, ALIAR S.A. will provide biogas generated by the digestion of pig manure to use it as fuel to … Learn More
Generación de Energía a Través de Biogas en Granjas Porcícolas Aliar (Project)
Debido a que actualmente se presentan dificultades marcadas en el suministro del servicio de energía en la región, y por las dimensiones de los equipos en las instalaciones de Machijure, ALIAR S.A. viabilizará el biogás que se genera por la … Learn More
La flotación por aire disuelto es un proceso en el cual se introducen micro burbujas de aire en un estanque con agua industrial o lodo. Al ascender las micro burbujas, las partículas presentes en el líquido se adhieren a éstas, … Learn More
Harvesting and Recovery of Rainwater BUENCAFÉ (Project)
Separation, harvesting and recovery of rainwater harvested in 2,330 m2 of roofing: 996 m2 of plant roofing, 880 m2 of service area roofing and 454 m2 of cooling area roofing. The areas described have an average harvesting capacity of 9,490 … Learn More
Recolección y Recuperación de Agua Lluvia BUENCAFE (Project)
Separación, recolección y recuperación de agua lluvia recolectada en 2,330 m2de techo: 996 m2 techo planta, 880 m2 techos área de servicios, 454 m2 refrigeración. Las áreas descritas, tienen una capacidad de recolección promedio de 9.490 m3/año, capacidad máxima de … Learn More
Water storage and fog catch for agricultural production in hill Las Tunas, Villa María del Triunfo (Project)
The district of Villa María del Triunfo has a high water stress, arid most of the year. It has rates of extreme poverty of 0.8% and extreme poverty of 20.3%. In winter, the hill Las Tunas is covered with mist. … Learn More
Incrementar la capacidad de almacenamiento de agua durante todo el año (verano e invierno), para asegurar el riego de los cultivos y fortalecer la organización productiva comunitaria. El distrito de Villa María del Triunfo tiene un alto estrés hídrico, árida … Learn More
Improvement of water storage and distribution system in production plant (Project)
Mexichem used a water storage tank for domestic use (for administrative areas, toilets, dining room, dressing rooms, irrigation of green areas) and industrial use (for productive process and fire protection system). During maintenance days, this tank must be empty. In … Learn More