Reducing Water Consumption at Rohm's Tenryu Facility (Project)
By achieving "Mid-Goals towards 2020" for a 10% water withdrawal reduction for FY 2020 from 2009 ahead of schedule certainly with process improvement and appropriate cost input, we ensure the necessary production output with less water consumption. Project Results A … Learn More
Reducing Water Consumption at Rohm's Yabe River Facility (Project)
By achieving "Mid-Goals towards 2020" for a 10% water withdrawal reduction for FY 2020 from 2009 ahead of schedule certainly with process improvement and appropriate cost input, we ensure the necessary production output with less water consumption. Project Results A … Learn More
Reducing Water Consumption at Rohm's Katsura-Kamo Rivers Facility (Project)
By achieving "Mid-Goals towards 2020" for a 10% water withdrawal reduction for FY 2020 from 2009 ahead of schedule certainly with process improvement and appropriate cost input, we ensure the necessary production output with less water consumption. Project Results A … Learn More
Reducing Water Consumption at Rohm's Takahashi River Facility (Project)
By achieving "Mid-Goals towards 2020" for a 10% water withdrawal reduction for FY 2020 from 2009 ahead of schedule certainly with process improvement and appropriate cost input, we ensure the necessary production output with less water consumption. Project Results A … Learn More
Reducing Water Consumption at Rohm's Naruse River Facility (Project)
By achieving "Mid-Goals towards 2020" for a 10% water withdrawal reduction for FY 2020 from 2009 ahead of schedule certainly with process improvement and appropriate cost input, we ensure the necessary production output with less water consumption. Project Results A … Learn More
Reducing Water Consumption at Rohm's Kiyotake River Facility (Project)
By achieving "Mid-Goals towards 2020" for a 10% water withdrawal reduction for FY 2020 from 2009 ahead of schedule certainly with process improvement and appropriate cost input, we ensure the necessary production output with less water consumption. Project Results A … Learn More
Reducing Water Use at Sanofi's Indus River Site (Project)
As part of our water strategy concerning “high-risk” sites and as part of our SMART program, the site will define and follow water reduction plans at site level together with awareness actions at site level. The water treatment system has … Learn More
Reducing Water Use at Sanofi's Ciliwung Site (Project)
As part of our water strategy concerning “high-risk” sites and as part of our SMART program, the site will define and follow water reduction plans at site level together with awareness actions at site level. Following the definition of the … Learn More
Water Efficiency at Nampak's Berg-Olifants Facilities (Project)
Nampak's DivFood Paarl facility ceased all garden irrigation and car washing activity (at zero cost to company). In addition, approval was given to rainwater harvesting systems at the Paarl facility (total cost R20,000), and restrictive flow taps in its administrative … Learn More
Water Efficiency at Sasol's Orange River Operations (Project)
Our 2 largest operations Sasol Secunda Operations and Sasolburg Operations managed to achieve 19% and 29% savings, respectively. This was achieved by implementing the following measures: The watering of gardens and lawns with potable water was stopped. - The washing … Learn More