Location
Click Icon to Show on Map
|
City & Country |
---|---|
,
|
()
|
Onda Limpa (Clean Wave) (Project)
www.aesabesp.org.br/arquivos/etbs/22-ondalimpa-reynaldoyoung...
The first phase of the project diagnosed the environmental quality of Santos Estuary, São Vicente Estuary, Santos Bay, and surrounding coastal areas before implementing the Environmental Recovery Program of the Metropolitan Region of Santos, known as the Clean Wave Program. … Learn More
Northern Cape Mines Leadership Forum (Project)
Sedibeng (utility service provider) is responsible for supplying potable water from the Vaal Gamagara Water Supply Scheme (VGGWSS) to our Northern Cape mines. Mines are expected to fund a significant portion of the scheme. A Manganese Leadership Forum has been … Learn More
Operational Water Balance Study and Risk Assessment at Minas Rio Mine (Project)
To mitigate risk, the water resources team at Minas Rio developed an operational water balance, hydrological model and simulations to predict water abstraction stoppage periods in the Peixe River during the dry season. The current contingency plan has been implemented … Learn More
Integrated Water Management in Coal South Africa (Project)
At Coal South Africa, long-term integrated water management plans are being developed for sites to mitigate non-compliance risks and post-closure water management liabilities. These will be based on the development of robust conceptual hydrogeological models, which will provide high confidence … Learn More
Olifants River Join Water Forum (Project)
Anglo Platinum is a representative member and chairperson of the Executive Committee of the Olifants River Joint Water Forum which represents 22 mining companies with potentially 40 mining projects in the area. The forum is part of the Olifants River … Learn More
Risk Assessments for Aspen's Sites in South Africa (Project)
A detailed risk assessment was done for the South African operations. An internal project has been initiated to conduct the risk assessment for all Aspen Manufacturing sites. It is anticipated that this project will be completed by December 2017. Aspen … Learn More
Metering and Reducing Water Leaks at Bayer AG's Manufacturing Sites (Project)
We promote best practice and awareness through several water meters to monitor water use at different areas and find out any water leakage. As a site-specific target, the site set a maximum threshold for fresh water costs in 2016. We … Learn More
Collective Rainwater Harvesting in Costa Rica (Project)
Bayer AG is programing meetings with neighbors that use the same water sources in order to jointly promote make a better use of the water. The site also shares its rain water harvest experience with the neighbors. With regards to … Learn More
Water Replenishment in the Scheldt River Basin (Project)
Our water stewardship strategy includes a goal to replenish the water used in our beverages, where it is sourced from areas of water stress, by 2020. In Belgium, our SVAs have shown that we operate in areas of water stress … Learn More
Source Water Protection Plans for Coca-Cola European Partner's Production Sites (Project)
CCEP aims to reduce its water use ratio as far as possible, and in our legacy CCE territories, including Great Britain, we aim to reduce our water use ratio to 1.2 litres per litre of product produced. CCEP has put … Learn More