Water Efficiency at Unilever's Colorado River Manufacturing Site

<% join_label %>

Water Efficiency at Unilever's Colorado River Manufacturing Site

Show Full Map
Amazon
Area: 5888268 km2
Countries:
Brazil; Peru; Suriname; France; Colombia; Guyana; Bolivia; Venezuela; Ecuador
Cities:
Santa Cruz; Manaus; La Paz
PFAF ID:
HydroBasin Level:
Major Basin:
Sub-basin:
Show Selected Basin  |  Clear Selection
Baseline Water Stress:
Water Quality Stress:
Sanitation Access Stress:
Click to view individual basin.
Location
Click Icon to Show on Map
City & Country
,
()

Quick Info

Countries: United States of America
Basins: Colorado
Project SDGs:
Includes Sustainable Development Goals from the project and its locations.
Water Quality (SDG 6.3)
Water Use Efficiency (SDG 6.4)
Sustainable Production (SDG 12.4)
Services Needed: No services needed/offered
Desired Partner: Business
Language: English
Start & End Dates: Jan. 01, 2017  »  Ongoing
Project Source: CDP
Profile Completion: 59%

Project Overview

The factory team continue to work to identify areas for further efficiencies. During 2017, the site has continued to implement their improvement plans and installed 1) blowdown improvement project saving 11,300m3 of water whilst also resulting in significant savings associated with abstraction, chemicals and wastewater treatment costs - simple payback of 1.7years. In addition, the site also installed a solar thermal project, supporting the generation of hot water and minimis…

Read More

The factory team continue to work to identify areas for further efficiencies. During 2017, the site has continued to implement their improvement plans and installed 1) blowdown improvement project saving 11,300m3 of water whilst also resulting in significant savings associated with abstraction, chemicals and wastewater treatment costs - simple payback of 1.7years. In addition, the site also installed a solar thermal project, supporting the generation of hot water and minimising the site use of natural gas - simple payback of 2.7years. The site continue efforts towards zero liquid discharge operations. Water risks associated with Lake Mead water supply have been included within the North America’s Ice Cream Category risk assessment & business continuity planning meetings. Site teams have regular engagement with Southern Nevada Water Authority on short & medium term water access & infrastructure plans.

Project Results

water efficiency