UN Global Compact  |  CEO Water Mandate

Great Britain Colombia Brazil

Change of Technology in the Air-Conditioning System Universidad A…

<% join_label %>

Change of Technology in the Air-Conditioning System Universidad Autónoma De Occidente

Show Full Map
Amazon
Area: 5888268 km2
Countries:
Brazil; Peru; Suriname; France; Colombia; Guyana; Bolivia; Venezuela; Ecuador
Cities:
Santa Cruz; Manaus; La Paz
PFAF ID:
HydroBasin Level:
Baseline Water Stress:
Water Quality Stress:
Sanitation Access Stress:
Click to view individual basin.
Location
Click Icon to Show on Map
City & Country
,
()

Quick Info

Countries: Colombia
Basins: Magdalena
Project SDGs:
Includes Sustainable Development Goals from the project and its locations.
Increase Access to Water, Sanitation, Hygiene (SDG 6.1 & 6.2)
Water Use Efficiency (SDG 6.4)
Climate Resilience and Adaptation (SDG 13.1)
Project Tags:
Includes tags from the project and its locations.
Safe, Affordable Water
Progress to Date: 789,884 Khw/Year.
Services Needed: No services needed/offered
Desired Partner: Business
Language: English
Start & End Dates: Dec. 31, 2017  »  Ongoing
Project Website: campussostenible.org
Project Source: El Agua nos Une
Profile Completion: 74%

Project Overview

The project consisted of the modernization of the cooling plant of the central building by replacing the two condensed air chillers with two condensed water chillers, which are considered more energy efficient.

Project Results

  • Savings in energy from one technology to the other amount to approximately 50%, and in relation to the campus’ total energy consumption it amounts to 8%.
  • Savings in energy after modernizing the cooling plant of the central building will be equivalent …

Read More

The project consisted of the modernization of the cooling plant of the central building by replacing the two condensed air chillers with two condensed water chillers, which are considered more energy efficient.

Project Results

  • Savings in energy from one technology to the other amount to approximately 50%, and in relation to the campus’ total energy consumption it amounts to 8%.
  • Savings in energy after modernizing the cooling plant of the central building will be equivalent to 789,884 Khw/Year.
  • Savings in relation to the system’s energy consumption of approximately COP$215,000,000/year.
  • Greater efficiency and comfort.
  • Return on investment in eight years, but can be reduced to five with new AC automation projects.
  • These pieces of equipment use less space in a more effective manner, 180 m2 instead of 250 m2.

Sourced From:

Partner Organizations


Implementar la política exterior del Consejo Federal sobre la ayuda humanitaria y el desarrollo. El Programa Global Agua trabaja en soluciones para asumir los desafíos globales, participando en el diálogo político, generando y apoyando proyectos innovadores. Learn More

Carol Viviana Hurtado Montoya
Primary Contact  
Maly Puerto
Admin  
Carlos Toro
Admin  

   Loading Lessons