UN Global Compact  |  CEO Water Mandate

Great Britain Colombia Brazil

Water Stewardship at CCEP's Production Sites - Rheine & Main

<% join_label %>

Water Stewardship at CCEP's Production Sites - Rheine & Main

Show Full Map
Amazon
Area: 5888268 km2
Countries:
Brazil; Peru; Suriname; France; Colombia; Guyana; Bolivia; Venezuela; Ecuador
Cities:
Santa Cruz; Manaus; La Paz
PFAF ID:
HydroBasin Level:
Baseline Water Stress:
Water Quality Stress:
Sanitation Access Stress:
Click to view individual basin.
Location
Click Icon to Show on Map
City & Country
,
()

Quick Info

Countries: Germany
Basins: --
Project SDGs:
Includes Sustainable Development Goals from the project and its locations.
Water Quality (SDG 6.3)
Water Use Efficiency (SDG 6.4)
Protect and Restore Ecosystems (SDG 6.6)
Sustainable Production (SDG 12.4)
Services Needed: No services needed/offered
Desired Partner: Business
Language: English
Start & End Dates: Jan. 01, 2017  »  Ongoing
Project Source: CDP
Profile Completion: 59%

Project Overview

As part of CCEP’s This is Forward Sustainability Action Plan, we have a target to replenish 100% of the water used in our beverages, where it is sourced from areas of water stress, by 2020. In Germany, our SVAs, together with water stress mapping from the WRI’s Aqueduct project have shown that we operate in areas of water stress in 3 sites across two river basins where our manufacturing operations there. As a result, we have established a water replenishment programme with T…

Read More

As part of CCEP’s This is Forward Sustainability Action Plan, we have a target to replenish 100% of the water used in our beverages, where it is sourced from areas of water stress, by 2020. In Germany, our SVAs, together with water stress mapping from the WRI’s Aqueduct project have shown that we operate in areas of water stress in 3 sites across two river basins where our manufacturing operations there. As a result, we have established a water replenishment programme with The Coca-Cola Foundation and EUROPARC. Together we’ve been working to dredge and restore the water storage and filtering capacity of the Alte Elbe Klieken river oxbow.

Project Results

The aim of the project was to restore a part of the oxbow that had become silted up by removing sediment and allowing water from the Elbe River flood flows to refill it. This increases biodiversity and benefits the natural habitat for protected species and general wildlife. It also helps to restore some of the natural flood retention volume of the Elbe river basin. In 2017, we replenished 37,300 m3 of water through this Water Replenishment project.

Sourced From:

Partner Organizations


Coca-Cola European Partners plc (CCEP) is a multinational bottling company dedicated to the marketing, production, and distribution of Coca-Cola products. CCEP was created on 28 May 2016 as a result of the combination of the three main bottling companies for … Learn More

Megan Mitrevski Dale
Primary Contact  

   Loading Lessons